1. Application & Screening Documents
Required Documents:
-
Project Application Form - Official PEPD form
with project details
-
Project Summary (2-3 pages) - Brief overview
and purpose
-
Cost Estimate - Total project cost for
category determination
-
Project Timeline - Construction and
operational schedule
-
Land Ownership Proof - Deed, purchase
agreement, or lease
2. Environmental Assessment Documents
A. For EIA Projects:
-
Full Environmental Impact Assessment Report
- Executive summary
- Project description
- Policy and regulatory framework
- Baseline environmental conditions
- Impact identification and assessment
- Mitigation and management plans
- Monitoring plan
- Environmental Management Plan (EMP)
-
Non-Technical Summary - For public
understanding
-
Appendices & Supporting Data
- Laboratory test reports
- Consultant's credentials
- Maps and plans
- Baseline survey data
B. For IEE Projects:
-
Initial Environmental Examination Report
- Project description
- Environmental baseline
- Potential impacts assessment
- Mitigation measures
- Monitoring framework
-
Environmental Management Plan (simplified)
- Summary for Public Disclosure
3. Technical & Engineering Documents
-
Site Plans - Scale 1:1000 or as per
requirement
-
Layout Plans - Master plan with facilities
marked
-
Engineering Designs - Water supply,
wastewater, electrical
-
Topographic Maps - Contours and survey data
-
Geological Survey - For projects affecting
ground stability
-
Hydrological Survey - If near water bodies
-
Drainage Plans - Stormwater and wastewater
system
-
Utility Infrastructure Plans - Power, gas,
communication lines
4. Environmental Baseline Studies
Air Quality
-
Ambient air quality monitoring report (minimum 24-hour
samples)
- Analysis for PM10, PM2.5, SO₂, NO₂, CO, O₃
- Laboratory certificates and methodology
Water Quality
- Groundwater and surface water analysis
- pH, TDS, BOD, COD, heavy metals testing
- Hydrogeological survey report
- Water availability assessment
Soil Quality
- Soil sampling and analysis report
- Soil classification and contamination assessment
- Agricultural productivity assessment (if relevant)
Noise Baseline
- Ambient noise level monitoring
- Day and night measurements
- Comparison with NEQS standards
Biodiversity
- Flora and fauna survey report
- Species identification and inventory
- Habitat assessment
- Protected species assessment (if applicable)
5. Public Consultation Documents
-
Newspaper Advertisements (2) - Two different
publications
-
Public Notice - Display at site and nearby
location
-
Notice Display Photographs - With date stamp
-
Public Meeting Invitation - Distributed to
community
-
Meeting Minutes - Attendance list with
signatures
-
Public Feedback Forms - Compiled responses
-
Response to Concerns - How concerns were
addressed
-
Grievance Register - Record of complaints
received
6. Legal & Statutory Documents
-
Land Deed/Purchase Agreement - Proof of
ownership or lease
-
CNIC/Registration Certificate - Project
proponent identification
-
Authorization Letter - If applying through
agent
- Company Registration - If applicable
-
Tax Certificate - Valid tax registration
-
Industrial Registration - If applicable
7. Statutory NOCs & Approvals
-
NOC from District Administration - If
required by local law
-
Municipal/City Government NOC - Land use
compatibility
-
NOC from Wildlife Department - If near
protected areas
-
NOC from Forest Department - If affecting
forest land
-
NOC from Local Authority - Land use approval
-
Fire Safety Clearance - For
industrial/commercial projects
-
Building Bye-Laws Approval - Structural
compliance
8. Project-Specific Additional Documents
| Project Type |
Additional Documents Required |
| Industrial Plants |
Process flow diagrams, waste disposal plan, safety
measures
|
| Housing Schemes |
Green space layout, waste management system design |
| Power Projects |
Fuel source assessment, emissions calculation, cooling
system design
|
| Mining Operations |
Reclamation plan, overburden management, rehabilitation
plan
|
| Infrastructure |
Traffic impact study, resettlement plan if needed |
| Healthcare Facilities |
Biomedical waste management, laboratory testing procedures
|
9. Financial & Resource Documents
-
Project Cost Breakdown - Detailed budget
-
Environmental Management Budget - Cost for
EMP implementation
-
Financial Proof - Bank statements or loan
sanction letter
-
Processing Fee Payment - Receipt or challan
-
Insurance Policy - Environmental liability
insurance
10. Consultant Credentials
-
Consultant Registration - With PEPD or
professional body
-
Qualifications - Educational certificates and
experience
-
Professional License - Valid professional
credentials
-
Previous Project References - Similar
projects completed
-
Declaration of Independence - Not project
proponent or investor
11. Documentation Standards
-
Format: A4 paper size, typed or clearly
printed
-
Language: Urdu or English (bilingual
preferred)
-
Copies: Usually 3 printed copies + 1 CD copy
- Binding: Spiral or secure stitching
-
Pagination: All pages numbered with table of
contents
-
Quality: Clear, legible, professional
presentation
- CD Format: PDF files, clearly labeled
12. Checklist for Submission
Before submitting your application, verify:
-
All required
documents included
-
Documents
are in correct format
-
All copies
(printed and digital) provided
-
Page
numbering and table of contents complete
-
Consultant
qualifications verified
-
Processing
fee paid and receipt attached
-
Land
ownership document original or notarized copy
-
All
signatures and stamps in place
-
Maps and
plans at correct scale
-
CD properly
labeled with project details
Document Preparation Support
EcoVision assists with compilation and preparation of all
required environmental documentation. We ensure documents are
complete, accurate, and meet all PEPD requirements for swift
approval.
Contact us
for document preparation support.